6 February 2025
Publication series – 27 of 66 Insights
The Energy Efficiency Act (EnEfG) came into force on 18 November 2023 and serves as a national implementation act for the amended EU Energy Efficiency Directive (EED) to achieve European energy and climate protection targets.
According to the Federal Ministry for Economic Affairs and Climate Protection (BMWK), there are more than 3,000 data centres in Germany. In view of the enormous demand for electricity - across the EU, data centres consume around 3-4% of the total electricity demand, and the trend is rising - the EED and EnEfG are establishing new requirements for data centres in particular with regard to energy efficiency and the reusability of energy. The obligations arising from the EnEfG relate to data centres with a non-redundant nominal connected load of 300 kW or more. According to the BMWK, this includes around 1,000 data centres in Germany.
With regard to waste heat data, a reporting obligation for affected companies and thus also for data centres has been in force since 1 January 2025 (the original reporting deadline of 1 January 2024 has been suspended). The corresponding data must then be submitted annually by 31 March in accordance with Section 17 (2) EnEfG.
The Federal Centre for Energy Efficiency (BfEE) has set up a waste heat platform to monitor the waste heat generated and potential waste heat capacities. The platform is intended to improve the centralised collection of data on waste heat utilisation in the future. It is also intended to create better transparency about waste heat potential on the market. Accordingly, waste heat utilisation is a key component of the energy transition.
These new reporting obligations also affect data centre operators, who must report the following data for the previous calendar year by 31 March of each year, Section 17 (1, 2) EnEfG:
The initial deadline for submitting the relevant information was 1 January 2025. On 15 January 2025, the BfEE published data from the waste heat platform for the first time. These include over 2,600 companies and their more than 19,000 waste heat potentials with an annual waste heat volume totalling 160 TWh.
In addition, Section 17 (1) EnEfG generally stipulates that companies are obliged to provide data on waste heat generated at the request of operators of heating networks or district heating supply companies and other potential heat-consuming companies.
Companies that violate the new reporting obligations or fail to fulfil them on time face fines of up to 100,000 Euros.
Section 4 of the EnEfG concerns energy efficiency in data centres. The energy efficiency requirements differentiate between requirements for energy consumption effectiveness and for the proportion of reused energy.
Data centres that go or went into operation before 01.07.2026 must comply with energy efficiency values of a maximum of 1.5 from mid-2027 and 1.3 by mid-2030. In addition, the general efficiency requirements for companies must be considered (Sections 16 et seq. EnEfG), according to which the waste heat generated must be avoided using state-of-the-art technology and the waste heat generated must be reduced to the proportion of technically unavoidable waste heat, insofar as this is possible and reasonable.
Stricter requirements (still) apply to data centres that commence operations after 01.07.2026. These must achieve an energy consumption efficiency value of a maximum of 1.2 and fulfil the further requirements of Section 11 (2) EnEfG on waste heat utilisation. These requirements must be met on a permanent basis no later than two years after commissioning on an annual average. With regard to waste heat utilisation, such data centres must achieve a share of at least 10% to a maximum of 20% reused energy, depending on the commissioning date.
However, there is often a lack of the required customers for the heat or heating infrastructure, which is why the exemptions in Section 11 (3) EnEfG are already coming into focus.
Section 11 (3) sentence 2 EnEfG sets out an obligation for heating network operators, according to which they must provide information on the capacity of the heating network when submitting an offer for waste heat utilisation by a data centre operator.
22 October 2025
by Multiple authors
23 September 2025
25 September 2025
by Multiple authors
18 September 2025
by Multiple authors
15 September 2025
8 September 2025
8 September 2025
by Dr. Michael Brüggemann, Johannes Schaadt-Wambach, LL.M. (Prag)
18 August 2025
by Johannes Schaadt-Wambach, LL.M. (Prag), Dr. Markus Böhme, LL.M. (Nottingham)
18 August 2025
by Multiple authors
31 July 2025
11 July 2025
by Multiple authors
17 June 2025
by Multiple authors
8 May 2025
by Multiple authors
17 April 2025
by Multiple authors
10 April 2025
by Multiple authors
10 April 2025
26 March 2025
26 March 2025
by Dr. Markus Böhme, LL.M. (Nottingham), Dr. Christian Ertel
26 February 2025
by Multiple authors
6 February 2025
by Multiple authors
11 December 2024
28 November 2024
by Dr. Christian Ertel, Dr. Markus Böhme, LL.M. (Nottingham)
11 November 2024
by Multiple authors
18 September 2024
by Dr. Christian Ertel, Dr. Markus Böhme, LL.M. (Nottingham)
10 September 2024
18 July 2024
by Dr. Patrick Vincent Zurheide, LL.M. (Aberdeen), Dr. Julia Wulff
11 July 2024
by Multiple authors
27 May 2024
21 February 2024
by Multiple authors
Power Play: Renewable Energy Update
26 January 2024
6 November 2023
by Dr. Niels L. Lange, LL.M. (Stellenbosch), Dr. Janina Pochhammer
Power Play: Renewable Energy Update
3 November 2023
Power Play: Renewable Energy Update
1 September 2023
by Dr. Paul Voigt, Lic. en Derecho, CIPP/E, Alexander Schmalenberger, LL.B.
Power Play: Renewable Energy Update
16 August 2023
Power Play: Renewable Energy Update
6 July 2023
Power Play: Renewable Energy Update
12 April 2023
by Multiple authors
27 January 2023
Power Play: Renewable Energy Update
12 July 2022
by Dr. Paul Voigt, Lic. en Derecho, CIPP/E, Dr. Markus Böhme, LL.M. (Nottingham)
Q&A series: Energy & Infrastructure
10 June 2022
Power Play: Renewable Energy Update
5 May 2022
Power Play: Renewable Energy Update
27 April 2022
Power Play: Renewable Energy Update
15 March 2022
Power Play: Renewable Energy Update
14 February 2022
Power Play: Renewable Energy Update
11 January 2022
Power Play: Renewable Energy Update
2 December 2021
Power Play: Renewable Energy Update
21 September 2021
by Olav Nemling
Power Play: Renewable Energy Update
18 August 2021
Power Play: Renewable Energy Update
12 July 2021
Power Play: Renewable Energy Update
8 June 2021
Power Play: Renewable Energy Update
25 May 2021
Power Play: Renewable Energy Update
6 April 2021
Power Play: Renewable Energy Update
23 March 2021
Power Play: Renewable Energy Update
by multiple authors
The key aspects of the Draft Bill and the requirements for data centre operators.
by multiple authors