The expansion of renewable energies is becoming increasingly complex. Whereas in the past a system was usually connected to the public grid through a direct line, today there are a variety of constellations in which the grid connection is shared. For example, either a common cable or a common route is used or various renewable energy systems are connected to a common substation or a battery storage system is installed at the sub-station or along the cable route. In addition, the rights to the renewable energy system, the connection infrastructure to the substation and the substation itself are increasingly being split between different companies.
In practice, the classification under energy law of the park cabling, the connection infrastructure and the substation has hardly been relevant to date, as the term “customer system” has been used in cases of doubt. In this context, the legislator only clarified at the end of 2023 that this also includes direct lines with a length of up to 5 km (Section 3 no. 24a(a) Energy Industry Act (EnWG)).
German law distinguishes between (unregulated) customer systems (Section 3 no. 24a and b EnWG) and direct lines (Section 3 no. 12 EnWG), whereby the direct line requires use by only one person/company (single use) and (partially or fully) regulated electricity grids. The law does not (yet) recognise a special category for connection infrastructures, meaning that these also generally fall into one of the three categories. The operation of a customer system or direct line is significantly less costly than grid operation and is also economically more attractive. According to Section 3 no. 16 EnWG, customer systems are not part of the energy supply grid and the operators of such systems are accordingly exempt from the grid operator obligations. In contrast, regulatory requirements apply to grid operation, grid fees must be calculated and charged (along with grid-related levies and charges) and grid operation requires approval from the regulatory authority.
In its ruling of 28 November 2024 (preliminary ruling procedure), the ECJ ruled that there is no model in European law for the customer system provision created in Germany in accordance with Section 3 no. 24a EnWG. The German regulation is therefore contrary to European law because it provides for additional exemptions from the obligations of a network operator over and above those provided for by the Internal Electricity Market Directive.
The Federal Court of Justice is expected to rule in May 2025, whereby there is virtually no room for argument in the constellation to be decided. However, it remains unclear whether the BGH and the BNetzA will apply the decision to all constellations or whether there will be special regulations due to the reversed constellation in the feed-in instead of withdrawal sector. This also applies to avoid jeopardising the clarification regarding direct lines that was only included in Section 3 no. 24a (a) EnWG.
It is still unclear whether Section 3 no. 24a EnWG will even be retroactively declared contrary to European law (meaning that grid fees, levies and charges will have to be charged retroactively), but this seems rather unlikely.
Particularly in constellations in which there is no single use of the connection lines or the sub-station, the question arises as to whether the ECJ’s decision will result in the infrastructure becoming a (regulated) network and its operator becoming a network operator subject to authorisation. This could have far-reaching consequences, particularly for contractual constructs for line or sub-station (shared) use and turn previous cost distribution mechanisms on their head.
Due to the far-reaching consequences of an infringement (fines and illegality of contractual provisions), it is not recommended to wait for a possible (positive) clarification for the renewable energy sector, but to consider the issues for new projects and projects in the planning stage.
We generally recommend the following steps in this regard:
If you have any questions, please do not hesitate to contact us.
par plusieurs auteurs
8 May 2025
par plusieurs auteurs
17 April 2025
par plusieurs auteurs
10 April 2025
par plusieurs auteurs
31 March 2025
par Dr. Christian Ertel, Dr. Markus Böhme, LL.M. (Nottingham)
26 March 2025
26 March 2025
par Dr. Markus Böhme, LL.M. (Nottingham), Dr. Christian Ertel
26 February 2025
par plusieurs auteurs
6 February 2025
par plusieurs auteurs
11 December 2024
11 December 2024
28 November 2024
par Dr. Christian Ertel, Dr. Markus Böhme, LL.M. (Nottingham)
11 November 2024
par plusieurs auteurs
18 September 2024
par plusieurs auteurs
10 September 2024
par Tobias Baus, LL.M., Dipl.-Ing., Dr. Thomas Pattloch, LL.M.Eur
18 July 2024
par Dr. Patrick Vincent Zurheide, LL.M. (Aberdeen), Dr. Julia Wulff
11 July 2024
par plusieurs auteurs
27 May 2024
21 February 2024
par plusieurs auteurs
Power Play: Renewable Energy Update
26 January 2024
6 November 2023
par Dr. Niels L. Lange, LL.M. (Stellenbosch), Dr. Janina Pochhammer
Power Play: Renewable Energy Update
3 November 2023
Power Play: Renewable Energy Update
1 September 2023
par Dr. Paul Voigt, Lic. en Derecho, CIPP/E, Alexander Schmalenberger, LL.B.
Power Play: Renewable Energy Update
16 August 2023
Power Play: Renewable Energy Update
6 July 2023
Power Play: Renewable Energy Update
12 April 2023
par plusieurs auteurs
27 January 2023
Power Play: Renewable Energy Update
12 July 2022
par Dr. Paul Voigt, Lic. en Derecho, CIPP/E, Dr. Markus Böhme, LL.M. (Nottingham)
Q&A series: Energy & Infrastructure
10 June 2022
Power Play: Renewable Energy Update
5 May 2022
Power Play: Renewable Energy Update
27 April 2022
Power Play: Renewable Energy Update
15 March 2022
Power Play: Renewable Energy Update
14 February 2022
Power Play: Renewable Energy Update
11 January 2022
Power Play: Renewable Energy Update
2 December 2021
Power Play: Renewable Energy Update
21 September 2021
par Olav Nemling
Power Play: Renewable Energy Update
18 August 2021
Power Play: Renewable Energy Update
12 July 2021
par Carsten Bartholl
Power Play: Renewable Energy Update
8 June 2021
Power Play: Renewable Energy Update
25 May 2021
Power Play: Renewable Energy Update
6 April 2021
Power Play: Renewable Energy Update
23 March 2021
par plusieurs auteurs
par plusieurs auteurs